 DJI_0095

Culvert Improvement Project
(In-Progress)

Crystal Creek takes water out of Crystal Lake and passes under roads through culverts. These culverts will be removed and replaced. The Culvert Improvement Project is needed because the culverts are 50-75 years old and beyond their useful life. 

 DJI_0093

Virginia Road and Route 14
(In-Progress)

The intersection improvement includes an addition of a second left-turn lane on Virginia Road, an addition of an eastbound right-turn lane on Route 14, an upgrade to traffic signal equipment, pedestrian accommodations, and bike lane striping along Virginia Road to Berkshire Lane.

 Resurfacing

Street Resurfacing Program
(In-Progress)

The City of Crystal Lake monitors road conditions and annually develops a program to repair streets that have deteriorated and need repair. The repairs consist of removing the top layer of asphalt, making spot repairs to the exposed base, and then putting a new surface back on the street.

 DJI_0075

Main Street and Crystal Lake Avenue Intersection
(Future Improvement)

The intersection improvement of Main Street and Crystal Lake Avenue includes: widening and resurfacing Main Street and Crystal Lake Avenue, installing a permanent traffic signal, adding intersection lighting, and streetscaping elements. 

 176-Main (4)

North Main Street:
Woodstock Street to Route 176 
(Future Improvement)

This project includes resurfacing North Main Street, adding a new traffic signal at Route 176, adding an eastbound right-turn lane on Route 176, adding a northbound left-turn lane on North Main Street, and upgrading the water main.