Crystal Vista South Study Area

Print
Press Enter to show all options, press Tab go to next option
   WHAT ARE WE DOING

 

  • September 26, 2018:  The design engineering is being finalized.
  • June 13, 2018:  Baxter and Woodman will be surveying the area on June 15. Residents have been provided a letter notifying them of this work.  
  • June 4, 2018: A kick-off meeting was held with the design consultant for the new storm sewer installation.  
  • June 1, 2018: Baxter and Wooodman has been selected to complete the design for the installation of a new storm sewer for the Gardina Vista depressional area.  
  • February 8, 2018: City staff met with residents of all the Crystal Vista Areas for a final check-in. View the presentation slides.
  • January 22, 2018: Letters were mailed to all the residents in the area inviting them to the open house.  
  • September 12, 2017:City staff met with residents in the study area. Meeting minutes are available here
  • August 1, 2017: Letters will be mailed to all residents in the study area inviting them to the open house.
  • July 18, 2017: City Council presentation to review the stakeholder engagement process to review and refine improvements to reduce the risk of flooding.
  • June/July 2017: City experienced successive and excessive rain events leading to the total rainfall for June and July of almost 20 inches, over double the normal average.
  • Summer 2016: Survey of the two main depressional areas was completed.
  • Winter 2013: City’s stormwater consultant completed a more detailed analysis to determine potential alternatives to provide an outlet for water ponding in the depressional areas.
  • March 2009: A flooding study was completed which helped determine the causes of the flooding and conceptual solutions. The study identified two depressional areas that hold water. Click here for a map showing the depressional areas.
  • August 2007: Successive rain events led to Crystal Lake receiving between 11 and 12 inches of rainfall which produced the highest lake level ever recorded and areas around the lake experienced significant flooding.
   HISTORY

  • Many of these homes were initially built in the 1920s and 1930s as summer cottages and three-season homes.
  • As the demand for year-round homes in Crystal Lake grew, more homes were converted to year-round residences.
  • In the late 1960s, the residents of this area annexed into Crystal Lake and water main and sanitary sewer services were extended throughout.
  • Curb and gutter with a storm sewer system does not exist throughout this area. The drainage is conveyed through ditches.
  COMMENTS
We want to hear from you! Please submit your questions, concerns, and stories to: stormwatersolutions@crystallake.org

Please don't forget to include your name, address, and phone number so the City can get back to you. Pictures are appreciated, but the City can't receive emails with a total of over 10 MB of attachments.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer